1 of 1
Offline
Prototypes of the southern border wall are under construction in the San Diego area. They have to be completed by
Oct. 26, 2017. The border wall built near years ago dramatically cut illegals from crossing the border.
A first look at 8 possible versions of President Donald Trump's border wall
SAN DIEGO — Workers toiled in intense 95-degree heat here Tuesday, putting final touches on eight possible versions of President Donald Trump's long-promised border wall.As an Oct. 26 deadline to finish the prototype border-wall designs drew near, The Arizona Republic toured the construction site a few dozen yards from the border that divides this city from neighboring Tijuana, Mexico.U.S. Customs and Border Protection awarded eight contracts to six companies, including two from Arizona, to build the prototypes.
Four are made of reinforced concrete, and another four incorporate additional construction materials. Construction began on Sept. 26, giving companies 30 days to finish.By Tuesday afternoon, when CBP allowed The Republic access to the site, five of the wall designs had already been completed and were fenced off with caution tape.But crews were still at work on others, installing vertical concrete panels on one design, using cranes and bulldozers to place them upright. Another two prototypes were in various stages of construction.
Offline
I have to take my hat off to anyone who still believes that that thing will ever be built.
Offline
There will be no wall.
Offline
[img]
,f_auto,q_auto,w_auto/wtaij1ge9kuidivjz8m7/espacio-cero-the-invisible-wall.jpg[/img]Offline
Whatever became of that wall in Berlin?
How did that whole thing work out?
1 of 1